Aleksinac, Serbia · since 2014

Sun and wind, engineered to work for you

Hadži Energy is a design bureau from Aleksinac, Serbia, specialized in renewable energy — from concept design and the main project for a solar power plant or wind farm, to permits, grid connection and on-site supervision.

Željko Janković, civil engineer · site supervisor · Knjaza Miloša 71/3, Aleksinac

0Year founded
Civil engineerLead designer
AA+Company credit rating
AleksinacBased here, working nationwide
Services

What we design

Complete technical documentation for renewable energy projects — from the first feasibility estimate to commissioning. Drag or scroll the cards for more.

Solar power plant design

Concept and main projects for photovoltaic systems — for households, farms and commercial buildings, grid-tied and off-grid solutions.

Learn more

Wind farm design

Site studies, technical documentation and calculations for wind farms and individual wind turbines.

Learn more

Grid connections

Grid connection projects for power plants and coordination with the distribution operator through to final approval.

Learn more

Technical supervision

On-site supervision and construction management — from staking out the site to final handover of the plant.

Learn more

Energy consulting

Feasibility analysis, equipment selection and energy-efficiency advice before you invest.

Learn more

Permits & regulations

Studies and complete documentation needed to obtain building permits and approvals.

Learn more
Željko Janković, founder of Hadži Energy
Željko Janković Founder
About us

An engineer who is on-site, not just on paper

Hadži Energy is led by Željko Janković, a civil engineer (Faculty of Civil Engineering and Architecture, University of Niš), currently a PhD candidate at the same faculty, and holder of three licenses from the Engineering Chamber of Serbia — for responsible designer (310), responsible works contractor (410), and energy efficiency (381). He has worked in the field since 2005, and has led the Hadži Energy bureau since 2014.

Beyond project documentation — more than 500 preliminary designs to date — he regularly takes on the role of responsible works contractor and technical supervisor, including supervision of five solar power plants around Aleksinac and Vranje (over 28 MW combined) and technical inspection of more than 30 engineering structures. Before founding his own bureau, he designed dozens of small hydropower plants, wind farms and solar installations at Ekoenergo inženjering.

The focus is on renewable energy: solar power plants and photovoltaic systems, as well as wind farms and wind turbines, together with the supporting electrical and civil engineering documentation.

Company name
Željko Janković PR, Hadži Energy Design Bureau
Activity
7112 — Engineering activities and technical consulting
Headquarters
Knjaza Miloša 71/3, 18220 Aleksinac
Founded
10 Dec 2014

Read the full biography →

Client reviews

What people we've worked with say

An example of how this section looks — replace with real client statements before publishing.

The solar plant project for our farm was done quickly, with a clear explanation of every step. We got our permits without a single objection.
MI
Marko IlićIlić Agrar d.o.o.
We needed someone who understood both winemaking and the technical side of solar. The proposal was tailored to our actual consumption, not a generic package.
JP
Jovana PetrovićPetrović Winery
Site supervision was regular, not just a formality. Every change during construction was immediately logged in the documentation.
DS
Dragan StankovićStanković Logistics
As a small business we weren't sure our own power plant would pay off. The feasibility analysis gave us a clear answer before we signed anything.
AN
Ana NikolićEco Hostel Sunčev Breg
Our production plant runs all year, so power stability was our priority. Grid connection went through without disrupting production.
NR
Nenad RistićRistić Dairy
The site study for our wind farm was thorough and honest — it included the risks, not just the potential. That saved us time further down the investment process.
MĐ
Milica ĐorđevićPrivate investor
Note: the reviews shown are examples to demonstrate how this section looks and are not statements from real clients.
Process

How we work

Four steps from the first idea to a power plant producing electricity.

01

Consultation and site visit

A conversation about your needs, an inspection of the plot or roof, and an assessment of technical feasibility.

02

Concept design and calculation

Sizing the system, estimating energy output and indicative payback period.

03

Main project and permits

Preparing complete technical documentation and obtaining the required approvals.

04

Supervision and commissioning

Following construction on site, grid connection and handover of the finished plant.

Fields of work

Who we design for

Households

Solar systems for own consumption, with or without battery storage.

Business & agriculture

Higher-capacity plants for production facilities, warehouses and farms.

Wind energy investors

Site studies and technical documentation for wind farms and turbines.

Blog

Articles on renewable energy

Posts that answer common questions about solar power plants and wind farms — and build the site's visibility on Google.

Prosumer status in Serbia: how it works and how it lowers your bill

We explain net metering, how much capacity a household system may have, and why the application deadline matters for keeping the better billing model.

Solar panel subsidies in Serbia — conditions and deadlines

An overview of the current co-financing programme for individuals, who qualifies, and what to check before applying through your local municipality.

When do you need an energy permit for a wind farm?

The 1 MW threshold, issuing deadlines, and the steps that precede the building permit — a guide for wind farm investors.

How many solar panels does an average household need?

How system size is determined — consumption, roof area, orientation and panel power — with a practical calculation example.

Preliminary, main and as-built design — the difference, and which one you need

We explain the three phases of project documentation in energy and construction, and when each one is actually required.

Technical inspection of a solar plant: documentation and common causes of delay

What the commission checks, which documents to prepare in advance, and the mistakes that most often delay the occupancy permit.

Small hydropower or solar power plant — which pays off more?

A comparison by site requirements, procedure and long-term profitability, for investors choosing between the two.

Grid connection for renewable-energy plants: steps and common mistakes

How the grid-connection procedure works, and the mistakes that most often extend project timelines.

Building energy efficiency and license 381 — why it matters to investors

What an energy-efficiency report covers and why it's an important part of the project documentation alongside a solar plant.

Wind farm development stages: from wind measurement to commissioning

An overview of the full process — from wind-potential assessment and impact studies, through design, to grid connection and commissioning.

Note: the full articles are written in Serbian for local search visibility — each link opens the Serbian version. Get in touch if you'd like an English translation of a specific article.
Contact

Let's talk about your project

Reach us by phone, email or the form below — we get back to you as soon as possible.

Address
Knjaza Miloša 71/3, 18220 Aleksinac, Serbia
Phone
064 227 2627 · 066 476 496
Email
hadzi.energy@gmail.com
Instagram
@hadzienergy

By sending this form you agree to be contacted by phone or email regarding your request.