Solar power plant design
Concept and main projects for photovoltaic systems — for households, farms and commercial buildings, grid-tied and off-grid solutions.
Learn moreHadži Energy is a design bureau from Aleksinac, Serbia, specialized in renewable energy — from concept design and the main project for a solar power plant or wind farm, to permits, grid connection and on-site supervision.
Complete technical documentation for renewable energy projects — from the first feasibility estimate to commissioning. Drag or scroll the cards for more.
Concept and main projects for photovoltaic systems — for households, farms and commercial buildings, grid-tied and off-grid solutions.
Learn moreSite studies, technical documentation and calculations for wind farms and individual wind turbines.
Learn moreGrid connection projects for power plants and coordination with the distribution operator through to final approval.
Learn moreOn-site supervision and construction management — from staking out the site to final handover of the plant.
Learn moreFeasibility analysis, equipment selection and energy-efficiency advice before you invest.
Learn moreStudies and complete documentation needed to obtain building permits and approvals.
Learn more
Hadži Energy is led by Željko Janković, a civil engineer (Faculty of Civil Engineering and Architecture, University of Niš), currently a PhD candidate at the same faculty, and holder of three licenses from the Engineering Chamber of Serbia — for responsible designer (310), responsible works contractor (410), and energy efficiency (381). He has worked in the field since 2005, and has led the Hadži Energy bureau since 2014.
Beyond project documentation — more than 500 preliminary designs to date — he regularly takes on the role of responsible works contractor and technical supervisor, including supervision of five solar power plants around Aleksinac and Vranje (over 28 MW combined) and technical inspection of more than 30 engineering structures. Before founding his own bureau, he designed dozens of small hydropower plants, wind farms and solar installations at Ekoenergo inženjering.
The focus is on renewable energy: solar power plants and photovoltaic systems, as well as wind farms and wind turbines, together with the supporting electrical and civil engineering documentation.
An example of how this section looks — replace with real client statements before publishing.
The solar plant project for our farm was done quickly, with a clear explanation of every step. We got our permits without a single objection.
We needed someone who understood both winemaking and the technical side of solar. The proposal was tailored to our actual consumption, not a generic package.
Site supervision was regular, not just a formality. Every change during construction was immediately logged in the documentation.
As a small business we weren't sure our own power plant would pay off. The feasibility analysis gave us a clear answer before we signed anything.
Our production plant runs all year, so power stability was our priority. Grid connection went through without disrupting production.
The site study for our wind farm was thorough and honest — it included the risks, not just the potential. That saved us time further down the investment process.
Four steps from the first idea to a power plant producing electricity.
A conversation about your needs, an inspection of the plot or roof, and an assessment of technical feasibility.
Sizing the system, estimating energy output and indicative payback period.
Preparing complete technical documentation and obtaining the required approvals.
Following construction on site, grid connection and handover of the finished plant.
Solar systems for own consumption, with or without battery storage.
Higher-capacity plants for production facilities, warehouses and farms.
Site studies and technical documentation for wind farms and turbines.
Posts that answer common questions about solar power plants and wind farms — and build the site's visibility on Google.
We explain net metering, how much capacity a household system may have, and why the application deadline matters for keeping the better billing model.
An overview of the current co-financing programme for individuals, who qualifies, and what to check before applying through your local municipality.
The 1 MW threshold, issuing deadlines, and the steps that precede the building permit — a guide for wind farm investors.
How system size is determined — consumption, roof area, orientation and panel power — with a practical calculation example.
We explain the three phases of project documentation in energy and construction, and when each one is actually required.
What the commission checks, which documents to prepare in advance, and the mistakes that most often delay the occupancy permit.
A comparison by site requirements, procedure and long-term profitability, for investors choosing between the two.
How the grid-connection procedure works, and the mistakes that most often extend project timelines.
What an energy-efficiency report covers and why it's an important part of the project documentation alongside a solar plant.
An overview of the full process — from wind-potential assessment and impact studies, through design, to grid connection and commissioning.
Reach us by phone, email or the form below — we get back to you as soon as possible.