Service

Solar power plant and photovoltaic system design

Complete technical documentation for photovoltaic systems — from an initial consumption estimate, through concept and main design, to prosumer status and connection to the distribution grid.

What a solar power plant project includes

Every solar plant, regardless of size, starts with a calculation — not with mounting panels. The project includes an analysis of annual electricity consumption, roof or plot orientation and tilt, equipment selection (panels, inverter, optionally battery storage), and sizing the system to match actual needs rather than a generic template.

Depending on the purpose, we prepare a concept design for a quick feasibility estimate, as well as a main project that serves as the basis for construction, the work notification, and grid connection.

Grid-tied, hybrid and off-grid systems

Choosing the system type depends on whether the site has grid access and how important energy independence is:

  • Grid-tied — connected to the distribution grid, no batteries. The most cost-effective type for sites that already have a connection, with the shortest payback period.
  • Hybrid — combines solar panels, battery storage and the grid. Provides greater independence during power outages, with a somewhat longer payback period.
  • Off-grid — fully independent system, intended for sites without access to the distribution grid (holiday homes, remote farms).

Prosumer status

Households and businesses that produce electricity from their own solar plant and feed part of the surplus back into the grid acquire official prosumer status ("kupac-proizvođač") in Serbia. This status enables net metering: the energy you feed into the grid is offset against the energy you draw, and unused surplus carries over month to month until the end of the billing year on 31 March.

Households may register a plant of up to 10.8 kW. Businesses and larger systems fall under a separate settlement model (net billing), which differs from the household model.

When designing, we account for the deadlines relevant to keeping the more favourable net-metering model — currently a relevant factor when planning the timing of your application, which we check for each project individually, since the regulations in this area are subject to change.

Solar panel subsidies

Individuals currently have access to subsidies that co-finance part of the installation cost, under a programme run by the Ministry of Mining and Energy together with local municipalities. The co-financing percentage and upper limit are set at the national level and are identical regardless of municipality — what differs is only whether a given municipality currently has an open call. During consultations we check the current terms of the call for your municipality, since these calls are renewed periodically.

The procedure, step by step

  1. Consumption and site analysis — based on your electricity bills and an inspection of the roof or plot, we determine the optimal system size.
  2. Concept design — an indicative estimate of energy output, equipment and feasibility.
  3. Main project — complete technical documentation with calculations and equipment specifications.
  4. Construction and bidirectional meter installation — the contractor installs the system according to the project.
  5. Application to the distribution operator — documentation is submitted electronically to obtain prosumer status and grid connection.

Frequently asked questions

Do I need a project if a contractor installs the system turn-key?

Yes. Regardless of who installs the system, compliant technical documentation is required — it is the basis for the work notification, grid connection, and confirms the system is correctly sized for your consumption.

How much capacity may a household plant have?

Households may register a plant of up to 10.8 kW under prosumer status, with net metering of surplus energy carried over until the end of the billing year.

Does the subsidy differ by municipality?

The co-financing percentage and upper limit are the same across Serbia. What differs by municipality is only whether a call is currently open and the size of that local government's budget for the year.

Planning a solar power plant?

Send us your electricity bill or basic details about the site — we'll come back with an indicative system size and next steps.

Request a free consultation